GTA 5 Transit Lines

Interactive corridor schematic and station-by-station schedules for the Los Santos Arrow Line, Pala Springs Aerial Tramway, and San Andreas Freight Rail.

View all lines on GTA 5 map

Last edited: 3 transit services (4 schedules)54.5 km physical rail track12 mapped stationsGTA Online overlayEnterable buildings

Transit Services3 linesArrow Line, Tramway, and Freight Rail
Route Network50.5 km4 extracted timetables
Mapped Stations12 stations10 metro stops plus 2 cableway terminals
Track Infrastructure54.5 km10 tracks including 8 yard spurs

Southern San Andreas rail and tram schematic

Select any route below or click a corridor on the map to frame its stations.

Freight Rail: Port of Los Santos, La Mesa, Davis Quartz, Grapeseed, and Paleto BayPala Springs Tramway: Mount Chiliad Aerial TramwayArrow Line: Los Santos Transit Light Rail Loop

Showing all 3 transit lines

Rail, Light Rail, and Aerial Tramway Services

All scheduled passenger and freight lines operating across Southern San Andreas in GTA 5 and GTA Online.

3

Arrow Line

Los Santos Transit Light Rail Loop

Metro
Length
18.0 km
Loop time
21 min
Stops
20
Elevated
35%

Regions: Strawberry, Little Seoul, Los Santos International Airport, Rockford Hills, Del Perro, Pillbox Hill, Davis

Station sequence (20 platform calls)
  1. Strawberry1.8 km leg
  2. Little Seoul836 m leg
  3. Los Santos International Airport1.1 km leg
  4. Los Santos International Airport488 m leg
  5. Los Santos International Airport577 m leg
  6. Los Santos International Airport505 m leg
  7. Little Seoul1.1 km leg
  8. Strawberry841 m leg
  9. Rockford Hills1.8 km leg
  10. Rockford Hills665 m leg
  11. Del Perro731 m leg
  12. Little Seoul989 m leg
  13. Pillbox Hill585 m leg
  14. Davis StationEnterable
    Davis868 m leg
  15. Davis StationEnterable
    Davis1.2 km leg
  16. Pillbox Hill865 m leg
  17. Little Seoul623 m leg
  18. Del Perro987 m leg
  19. Rockford Hills719 m leg
  20. Rockford Hills629 m leg

Pala Springs Tramway

Mount Chiliad Aerial Tramway

Aerial Tramway
Length
1.4 km
Run time
4 min
Stops
2 per trip
Cableway
100%

Regions: Paleto Forest, Mount Chiliad

Stop-by-stop schedules (2 directions, 2 stops each)

Ascent to Mount Chiliad Summit (1.4 km, 4 min)

  1. Mount Chiliad1.4 km leg

Descent to Pala Springs (1.4 km, 4 min)

  1. Paleto Forest1.4 km leg

Freight Rail

Port of Los Santos, La Mesa, Davis Quartz, Grapeseed, and Paleto Bay

Freight Rail
Length
29.7 km
Loop time
35 min
Passenger stops
None (freight)
Elevated
90%

Regions: Port of Los Santos, La Mesa, Davis Quartz, Grand Senora Desert, Grapeseed, Paleto Bay

View freight corridor summary

Continuous freight rail loop following the 29.7 km San Andreas Freight Mainline through the Port of Los Santos, La Mesa industrial district, Davis Quartz quarry, Grand Senora Desert, Grapeseed, and Paleto Bay without passenger stops.

Physical rail track networks and yard spurs

Track segments extracted from the GTA V Enhanced game files, covering the active Metro and Freight loops alongside 8 unscheduled railyard leads and industrial spurs.

Physical rail tracks in Southern San Andreas (54.5 km total)
NetworkTrack lengthActive serviceTrack nodes
San Andreas Freight Mainline29.7 km4,226 nodes
Los Santos Transit Arrow Line18.0 km2,250 nodes
Davis Quartz & Palmer-Taylor Spur1.8 kmUnscheduled yard / industrial spur286 nodes
Pillbox & Strawberry Connector Spur1.3 kmUnscheduled yard / industrial spur79 nodes
La Mesa Industrial Yard Lead1.1 kmUnscheduled yard / industrial spur137 nodes
Los Santos Freight Yard Bypass1.0 kmUnscheduled yard / industrial spur156 nodes
Cypress Flats & El Burro Branch0.8 kmUnscheduled yard / industrial spur82 nodes
Murrieta Heights Siding0.5 kmUnscheduled yard / industrial spur56 nodes
Mirror Park Railyard Spur East0.2 kmUnscheduled yard / industrial spur18 nodes
Mirror Park Railyard Spur West0.1 kmUnscheduled yard / industrial spur36 nodes

Transit lines FAQ

How many rail and tram lines operate in GTA 5?

Southern San Andreas has 3 active tracked transit services reconstructed from GTA V game track files: the Arrow Line light-rail loop across Los Santos (10 stations with 20 platform stops around the circuit), the bidirectional Pala Springs Aerial Tramway up Mount Chiliad, and the Freight Rail mainline running through Port of Los Santos, Davis Quartz, Grapeseed, and Paleto Bay.

Where does the Los Santos Arrow Line stop?

The Arrow Line forms an 18.0 km bidirectional-call urban rail loop connecting Strawberry, Puerto Del Sol, LSIA Parking, LSIA Terminal 4, Davis, Pillbox South, Del Perro, Burton, and Vinewood Center, with underground and surface platforms across central Los Santos and the airport.

Can you ride the freight train and cable car in GTA Online as well?

Yes. Southern San Andreas shares the same physical rail tracks and cableway in both GTA V Story Mode and GTA Online, so the transit overlay and directory apply to both maps.

Why does the game track data include unscheduled industrial spurs?

Besides the active passenger and freight corridors, the game's trains*.dat track definitions include 8 short yard leads, railyard bypasses, and industrial spurs around Mirror Park, Murrieta Heights, Cypress Flats, La Mesa, and Davis Quartz.